
Single — Before Pipe Installation
Integrated 150 mm hole saw and 230 mm recess disc. The Single configuration is centred from a 14 mm pilot hole before the waste pipe is installed.
Save time on manual cutting and preparation with purpose-built FC sheet recess tooling. Achieve clean, consistent recesses for compatible puddle flanges, ready for correct waterproofing integration.

Confirm the sheet and flange are suitable, form the permitted recess, then test-fit before bonding, sealing and membrane integration.


Use an attachment designed for FC sheet recessing to reduce repeated manual adjustment. Correct depth, dust extraction and final test-fitting still matter.
Both options use 230 mm FC recess tooling. Select the configuration to suit the drainage setup, then confirm flange and guide compatibility.

Integrated 150 mm hole saw and 230 mm recess disc. The Single configuration is centred from a 14 mm pilot hole before the waste pipe is installed.

Flywheel-guided configuration for a compatible installed waste pipe. Confirm guide fit and follow the Dual kit’s own instructions.
230 mm is the disc diameter. It is not the pipe size. ITA lists Allproof stepped leak-control flanges or equivalent compatible profiles. Check the actual flange diameter and underside geometry.
The Single kit combines the FC recess disc, integrated hole saw and extraction shroud. The Dual option uses its own flywheel-guided assembly; confirm the selected configuration before ordering.
Angle grinder sold separately. Confirm grinder compatibility before purchasing.


Recess depth must suit the actual flange and the flooring manufacturer’s requirements. Confirm sheet type, thickness, support and allowable material removal before use.
Use only on suitable compressed fibre cement flooring. Do not assume thin FC tile underlay is suitable for recessing. Confirm minimum residual thickness and support with the sheet manufacturer.
Single configuration: compatible 230 mm (9 inch) grinder with M14 thread and the correct shroud. Verify Dual mounting separately. Use suitable vacuum extraction and the required PPE.
Single: 14 mm pilot hole before pipe installation. Dual: confirm installed-pipe size and flywheel guide fit from the configuration-specific instructions.
Confirm the flange diameter and stepped underside profile. Test-fit, then complete fixing, bonding, sealing and membrane integration to the relevant manufacturers’ requirements.
Recessing alone does not establish compliance with AS 3740:2021. Correct substrate support, flange installation, sealing and waterproofing integration remain essential.
Select Single or Dual in the purchase panel above. Need help confirming the flange, grinder or sheet requirements? Speak with H2O Supplies before ordering.